Details: labour charges for removing grass, thorney shrubs, jungli shrub, kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. providing earth work in embankment with approved materials obtained from departmental land upto lead of 50 meter including all lifts, laying in layers of 20 centimeter to 30 centimeter thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller to achieve not less than 97 % of standard proctor density etc. complete ( material obtained from departmental land) watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 meter, not less than 97 % of stan
Sector: PWD