Details: item no.1:- cleaning grass and removal of up to a distance of 50meters outside the periphery of the area as directed. all leads & lifts etc complete as directed by engineer-in-charge item no.2: cutting down trees including cutting trunks & branches and stacking the material with all lift including uprooting and refilling the pit with material etc. complete as directed. (excluding extra material required for refilling) with all leads & lifts etc complete as directed by engineer-in-charge. item no.3: excavation in soft strata including boulders up to 0.6 m diameter (0.113cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with all leads & lifts etc. complete as directed by engineer-in-charge. item no.4: excavation in hard strata of all toughnes
Sector: Irrigation