Details: excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (lift upto 1.5 metre) by mechanical means excavation for foundation in hard murum including removing the excavated material upto distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (lift upto 1.50 metre) by manual means providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 centi metre to 20 centi metre thick including hand packing and compacting etcetera complete. providing and laying cast in situ/ready mix cement concrete in m-10 of
Sector: PWD