Details: supplyng all materials and executing the soil stabilization work with combo grouting technology using polyurethane injection foam resin and cement slurry complete in all respects required for completion of construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9-10 between bramhapuri - nagbhir station on gondia – chanda fort section (b.g.) by box pushing method webac/ normet / colossus / neoferma or equivalent make – single component polyurethane injection foam resin-supply item sdr – r51 - 3 mt lengh-supply item coupler – r 38 - supply item drill bit 76 dia tc - supply item cement opc / ppc-supply item drilling charges – 51 mm hole polyurethane injection groutingcharges cement injection groutingcharges
Sector: Transport Misc