Details: item description excavation for foundation upto 1.50 m lift including removing the excavated materials upto a distance of 50 metres beyond the building area and lift as specified, stacking and spreading, necessary dewatering unless provided elsewhere, preparing the bed for the foundation and required backfilling, ramming, watering, shoring and strutting etc. complete as direcetd in earth, soils of all types, sand, gravel and soft murum. providing dry/trap/granite/quartzite/gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting complete. dismantling stone masonry in lime or cement including stacking the materials as directed with all leads, lifts, complete. providing & laying in situ cement concrete in grade 1:3:6 (m-10) (cement consumption 4.4 bags/ ) of trap metal for foundation and bedding, including bailing out water manually, formwork, compacting and curing. providing & laying in situ cement concrete in grade 1:2:4 (m-15) (cement consumption 6.4 ba
Sector: Industries and Factories