Details: item no. 1-cutting down trees including cutting trunks & branches and stacking the material with all lift including uprooting and refilling the pit with material etc. complete as directed. (excluding extra material required for refilling) item no. 2- dismantling the stone masonry in cement mortar including stacking the material with all lifts etc. complete as directed. item no. 3-excavation in all kinds of soil including boulders upto 0.6m diameter (0.113cum) for canal, seating of embankment, filter drains/catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road/embankment including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with lead up to 1 km and all lifts as directed. item no. 4-excavation in hard murum including boulders upto 0.6 m diameter ( 0.113 ) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly
Sector: Irrigation