Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness by manual means in area of light jungle;demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of engineer in-charge. in cement mortar;dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking to the appropriate disposal area as per direction of engineer-in-charge.;earth work excavation for foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution ligh
Sector: Urban Authority