Details: dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of engineer-in-charge.pwd sr 2023-24 vo.2 item no19.30 page no-190;demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of engineer in-charge. in cement mortar.pwd sr 2023-24 vo.2 item no19.9.2 page no-187;demolishing cement concrete manually/ by mechanical means including disposal of material to the appropriate disposal area as per direction of engineer-in-charge.pwd sr 2023-24 vo.2 item no19.2.1 page no-187;earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including sett
Sector: Infrastructure