Description: Operation and Maintenance of 1 2MLD STP Sprinkler System Pumps Raw sewage pumps inside wharf and RCHW Colony at NMPA for the year 2024 25 and 2025 26 Name of Work Operation and Maintenance of 1 2MLD STP Sprinkler system Pumps Raw sewage pumps inside wharf and RCHW colony at NMPA for the years 2024 25 and 2025 26
Details: Descreption Operating and maintaining the 1.20 MLD sewage treatment plant. During the operation & maintenance the following works are to be attended on daily basis round the clock throughout the year by deploying a qualified person as per the requirement, including operating and maintenance of sewage pumps at RCHW colony and pump house No. I, in wharf and 1.2 MLD STP round the clock. The contractor has to follow the labour Regulations/Rules strictly as per Laws. Technician/supervisor Minimum 1 Nos (Skilled category) Diploma or BE in CIvil, Mechanical, Electrical or Environmental Engineering. Operating and maintaining sewage treatment plant for Two-year. The treatment plant has a capacity of 1.20 MLD, during the operation & maintenance the following works are to be attended on daily basis round the clock throughout the year by deploying sufficient labour, qualified person as per the requirement, including operating and maintenance of sewage pumps at RCHW colony
Sector: Harbor