Details: dismantling aluminium/ gypsum partitions: dismantling aluminium/ gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material to the appropriate disposal area as directed, cost including all lead and lift charges etc., complete.- in all the floor levels rearranging of existing furnitures: rearranging of existing wooden tables with cabin, including supporting members, cost of labour, stacking to the appropriate disposal area as per direction of engineer-in-charge. dismantling mosaic / ceramic tile/kota stone: dismantling mosaic / ceramic tile/kota stone work of any thickness in floors and roofs laid in cement mortar including, stacking material to the appropriate disposal of the debris with all lead (within the campus as directed) and lift etc., complete– in all the floor levels. vitrified tiles: providing and laying vitrified tiles in 1200mmx600mm sizes / 600x600sizes (thickness to be specified by
Sector: University