Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. by mechanical means using dozer ( in area of light jungle) complete with all lead and lift as directed by engineer incharge of work;de-silting of tank bed/ feeder channel/canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of all machinery, labour & all necessary works as directed and ccomplete with all lead and lift as directed by engineer incharge of work;earth work excavation for foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting,
Sector: Irrigation