Description: Providing and laying missing links in UGD Network along with Restoration Rehabilitation and Connecting Missing links of Sewer Links in Kalaburgi City under NGT Compensation Fund on DBOT Model
Details: Providing Sewer Pipeline and Machineholes including restoration of roads. The following works are included. a) Earth work Excavation in all Stratas including cutting and excavation of Asphalt Road, Concrete Road , etcb) Providing and laying of pipeline with 160, 200, 250 and 315 mm dia uPVC SN-8 pipes confirming to IS 16098:2013, length-58.85 km c) Providing and laying of pipeline with 250 and 300 mm dia RCC NP3 pipes confirming to IS IS: 458-1988, Length - 3.7 kmd) Providing and laying of pipeline of 150mm dia Stoneware pipes confirming to IS 651:1992, IS 4127, Length - 0.2 Km)e) Construction of BBK Masonry machinehole chambers of dia 1.2 to 1.5 m, with varying depth - 2087 Nos.f) Restoration of Flexible/Rigid pavements as per IRC guide lines, MORTH specification and with respect to existing road specification. Note: 1) All works and items shall be executed as per the IS, CPHEEO guidelines and MoRTH specifications mentioned in the contract. 2) Work shall be carried out as per the ins
Sector: Urban Authority