Description: Extension of HT LT lines reconditioning repairs of Distribution Transformers and connected accessories at 1 to 8 Blocks and Further Extension 9 to 12th Block of Anjanapura Layout BDA Bangalore Supply of DP Structure using 9 Mtr RCC Poles of 145Kg WL As per BESCOM specification and direction of the engineer in charge of work Supply of 9 mtr Long RCC pole 145Kg WL As per BESCOM specification and direction of the engineer in charge of work Supply of 8 Mtr long PSCC Pole 140 KG WL Stud poles As per BESCOM specification and direction of the engineer in charge of work Supply of Coyote Conductor for HT side As per BESCOM specification and direction of the engineer in charge of work Supply of H Frame for mounting GOS As per BESCOM specification and direction of the engineer in charge of work Supply of 11KV 400A Double break GOS As per BESCOM specification and direction of the engineer in charge of work Supply of 11KV 200Amps Single Break GOS As per BESCOM specification and direction of the engineer in charge of work Supply of 11KV Horizontal Cross arm with clamp bolts nuts etc As per BESCOM specification and direction of the engineer in charge of work Supply of HTST Support As per BESCOM specification and direction of the engineer in charge of work Supply of 11KV polymeric Pin insulator with 24mm dia FRP Rod As per BESCOM specification and direction of the engineer in charge of work Supply of 45 kn Polymeric Disc insulator As per BESCOM specification and direction of the engineer in charge of work Supply of Strain Clamps 3 bolts for connect to coyote As per BESCOM specification and direction of the engineer in charge of work Supply of PG clamps for Coyote to Coyote As per BESCOM specification and direction of the engineer in charge of work Supply of Spiral Earth Electrode for HT Poles As per BESCOM specification and direction of the engineer in charge of work Supply of Guyset Complete As per BESCOM specification and direction of the engineer in charge of work Supply of Concreting meterials for Guyset without cement As per
Details: Supply of DP Structure using 9 Mtr RCC Poles of 145Kg WL -As per BESCOM specification and direction of the engineer in charge of work.;Supply of 9 mtr Long RCC pole 145Kg WL -As per BESCOM specification and direction of the engineer in charge of work.;Supply of 8 Mtr long PSCC Pole 140 KG WL( Stud poles). -As per BESCOM specification and direction of the engineer in charge of work.;Supply of Coyote Conductor for HT side. -As per BESCOM specification and direction of the engineer in charge of work.;Supply of H Frame for mounting GOS -As per BESCOM specification and direction of the engineer in charge of work.;Supply of 11KV 400A Double break GOS -As per BESCOM specification and direction of the engineer in charge of work.;Supply of 11KV 200Amps Single Break GOS. -As per BESCOM specification and direction of the engineer in charge of work.;Supply of 11KV Horizontal Cross arm with clamp bolts nuts etc. -As per BESCOM specification and direction of the engineer in charge of work.;Supply of
Sector: Urban Authority