Details: descreption indoor residual spray to the port area, rchw colony, staff colony, cisf colony, barrack area, guest house, residential & nonresidential buildings and prohibited areas of electrical installations & water supply systems etc, including spraying to each buildings inside walls with using approved synthetic pyrethroids with approved dosage as recommended by engineer in-charge (approved by w.h.o) drawing up programmes in advance informing to department, maintaining register of spraying with signature of the occupants, taking necessary safety precautions including cost and conveyance of pesticides and all other materials, labours with ppe, t & p and all other incidental charges etc., complete. for the efficient control of mosquitos. (once in three months in each buildings of inside walls, inside and outside of security compound wall). required ppe's required any shall be provided to the workers as directed by the engineer-in-charge fogging treatment to the port area staff colony,
Sector: Harbor