Details: a) re building reach:clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials by (tractor) and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness including cost of all materials, labour, hire charges of machinary, barricading, loading & unloading, lead, lifts,transportation, with all incidental charges, etc., complete as per specification and as directed by the engineer in charge of work.(for new road) - in area of light jungle by manual means. removal of earth from the choked hill side drain and disposing it on the valley side manually, including cost of all materials, labour, hire charges of machinary, barricading, loading & unloading, lead, lifts,transportation, with all incidental charges, etc., complete as per specification and as direct
Sector: Road development