Description: Design, Engineering, Quality surveillance, Manufacture, Testing at manufacturers works, Packing, Forwarding, Supply, F.O.R destination including unloading, storage, Intra-site Transportation, insurance, , Testing, and Commissioning, up-gradation of latest PLC system including mandatory spares for RTPS CHP1 and CHP2 by dismantling existing relay based control systems and establishing centralized control room in existing CHP2 control room.
Sector: Generation