Description: Monitoring of water level at forebay during 24 hours 3 shifts in a day and weekly off on Saturday on rotation basis and all the days in a year 1 No. unskilled literate laborers required per shift. Apart from water level monitoring the workmen should monitor the CHEL load, Head works water level & continuous communication with Shiva control room Engineer. In case of CHEL (Private IPP 3MW Capacity) units trippings, 1500cusecs to the Shiva forebay gets severely disturbed and forebay workmen required to prevent air entry in penstocks, reduced to manage crisis, utilization of water by preventing spilling of water out of forebay. In addition, the workmen should clear the weeds collected at all 10 units trash track at least thrice in a shift. 1.02 The Executive Engineer (MSP&MM), Shivasamudram, Karnataka Power Corporation Limited (KPCL) or his authorized representative will receive bids in respect of Providing 07 workmen for Operation, monitoring of water level, collection & disposal of weeds at forebay, maintenance of penstocks, periodical assistance of day to day works at EE(MSP&MM) and SEE,AO,PO office at shiva HEP for the year 2019-20 (for a period of one year). All bids shall be prepared and submitted in accordance with the bid instructions.
Sector: Generation