Description: Removal of silt jungle clearance and nala trimming at Ch 108 200km syphon of IBC
Details: Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.( CSR(2023-24 cont. for 2024-25), Vol-III- P.No-9, I.No-2.5(ii-a);Removing and hauling all kinds of soil / soft rock including boulders upto 0.6 m diameter slipped due to natural causes and disposing off the same in specified dump area or as directed by mechanical means including cost of all materials, machinery, labour, rampways and all other ancillary operations complete.Note:1. The rate under this item is for unit quantity of soil / soft rock in slipped condition.2. The wieghted average rate applicable to entire quantity based on rates provided under items (8.25.2) and (8.26.2) may be considered where the slipped material consists o
Sector: Irrigation