Description: Procurement of additional Server Storage for the Existing ICCC Setup at Davanagere Smart City Limited
Details: S&S- Field Engineer for 24 Months deployment of resources should be after the O & M period of ICT Phase 1 i.e from 30th November 2027 to 30th November 2029-1.0-Specification:As per the Document , ;S&S- IT System & Network Engineer L3 for 24 Months deployment of resources should be after the O & M period of ICT phase-1 i.e from 30th November 2027 to 30th November 2029-1.0-Specification:As per the Document , ;S&S- Manager IT for 24 Months deployment of resources should be after the O & M period of ICT phase-1 i.e from 30th November 2027 to 30th November 2029-1.0-Specification:As per the Document , ;S&S- Warranty Extension of existing Servers for 2 years from 30th November 2027 to 30th November 2029-21.0-Specification:As per the Document , ;S&S- Miscellaneous Cost like Patch cords ,Powercable, electricl works Network cabling,Power distribution unit etc-1.0-Specification:As per the Document , ;S&S- 42 U Rack with warranty and Maintenance of 5 years-1.0-Specification:As per the Document , ;
Sector: Others