Description: Operation and Maintenance for the work of lifting of 29 90 TMC of water at PH 1 Shantipura and PH 2 Bettatavarekere from Bhadra Reservoir to Ajjampura Tunnel 0 00 to 40 29 km of UBP Main Canal including Civil and Electromechanical works for the period of 5 Years under Upper Bhadra Project on turnkey basis
Details: Operation and Maintenance for the work of lifting of 29.90 TMC of water at PH-1 Shantipura and PH-2 Bettatavarekere from Bhadra Reservoir to Ajjampura Tunnel (0.00 to 40.29 km of UBP Main Canal) including Civil and Electromechanical works for the period of 5 Years” under Upper Bhadra Project on turnkey basis;
Sector: Irrigation