Details: removing & resetting - removing & resetting existing heavy duty cobble/interlocking stones/pavers of thickness 60/75/80/100mm using cement and 40mm thick sand bed ( average thickness ) and compacting with plate to achieve final desired compaction & setting of paver to its final level , including cost of materials, labour and usage charges of machinery complete as per specifications. (the cost of new paver/stones required shall be added separately);maintenance of earthen shoulder (filling with fresh soil) - making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.ref to mort&h : irc - 3003;repair of old joints sealant - removal of existing sealant and re sealing of contraction, longitudinal or expansion joints in concrete pavement with fresh sealant material. ref to mort&h : irc - 3005.2;
Sector: PWD