Details: preparation and surface treatment of formation.- preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 t smooth wheeled roller, complete as per clause 310. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the engineer incharge of the work.;construction of subgrade and earthen shoulders construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments and other incidental charges r
Sector: RDPR