Details: fine dressing of the ground. ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same.2.29.1 all kinds of soil spreading of sludge, dump manure and/or good earth in required thicknessas per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). mixing earth and sludge or manure in the required proportion specified or directed by the officer-in-charge. supplying and stacking of good earth at site including royalty and carriage upto 5 km complete (earth measured in stacks will be reduced by 20% for payment). supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) : providing & planting of selection no. 1 / bermuda / shade grass on existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the
Sector: Electronics