Details: mobilization of equipments , transportation , loading and unloading the machineries and crew to site connected by main road by vehicle and demobilization after complete the work. setting up the equipment right each borehole location including carring all necessary plant equipment and materials of boring and collection of samples at each borehole. boring through ordinar soil and laterite soil subject to a minimum 04 borehole 10 m depth ( approximate). conducting spt in boreholes at any depth 04 bores ( 1m , 2m, 3m, 4.5m, 6m, 8m, 10 m) 07 samples total 04 bores. recovering disturbed samples from the various points 04 bores ( 1m , 2m, 3m, 4.5m, 6m, 8m, 10 m) 07 samples total 04 bores. point to point shifting (shifting of equipment's is more than 15 m) hard laterite cutting (will do as and when required) rock cutting ( will do as and when required ) laboratory testing chareges per bore preparation of report structural design & drawing of building including vetted from any iit, nit and