Details: preparation and surface treatment of formation. - preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 t smooth wheeled roller, complete as per clause 310. ref to mort&h : irc - 310 ---- all the items in the tender include all lead, lifts, loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and conyence of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of engineer - in - charge of this work;construction of subgrade and earthen shoulders - construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2. ref to mo
Sector: PWD