Details: scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by mechanical means using hydraulic excavator with in all lifts and lead. ref to mort&h : irc - 305.4.3 ---- including cost and conveyance of all materials labor hom of machineries equipment lead and lift loading and unloading charges transportation and all other incidental charges etc. complete the work shall be carried out as per standard technical detailed specifications and as per the directions of the engineer in charge of the work.;granular sub-base - by mix in place method - construction of granular sub-base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at omc and compacting with vibratory roller to achieve the desired density, complete as per clause 401 - for grading -v material. ref to mort&h : irc - 401 ---- including cost and conveyance of all materials labor hom of mac
Sector: PWD