Description: CONSTRUCTION OF CULVERT RETAININGWALL TO VATEKHAN TO MATHIKATTE BANAKAL LINK ROAD CONCRETE ROAD IN MUDIGERE TALUK VILLAGE ROAD
Details: Mechanical Means -Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials,Labour,Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer in-charge of the work.;Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes m
Sector: PWD