Details: maintenance of earthen shoulder (filling with fresh soil) making up loss of material / irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (average filling depth 150 mm), including all labour, usage charges of machinery, lead, lifts, loading, unloading transporting etc., complete. from km 30.75 to 36.50 of nh-169a and from km.124.00 to 153.00 of nh-169 (as per detailed estimate) removal of earth from the choked hill side drain and disposing it on the valley side manually, including all labour, lead, lifts, loading, unloading ,transporting etc., complete from km 30.75 to 36.50 of nh-169a and from km.124.00 to 153.00 of nh-169 (as per detailed estimate) clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials by (tractor) and stacking of serviceable material to be
Sector: Road development