Description: Restoration of canal section and repairs to Slipped portion from km 73 000 to 73 400 in Km No 74 Under GRBC Main canal
Details: Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness complete with all lead and lifts as directed by Engineer incharge.;Excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete in slussy condition complete with all lead and lifts as directed by Engineer incharge.;Earth work excavation for Foundation by mechanical means for all works & depth as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levell
Sector: Irrigation