Details: cleaning/sweeping of outer periphery of roads, footpaths, kerb stones, terraces including removing of grasss washing if necessary and removing dust, debris, garbage, cobweb, cowdung, leaves, plastic wastes from the site premises, shoulders, walls, gates etc.' and conveying & disposing off to the notified dump yard outside the site premises including cost of all material, labour, transportaion of labour and t&p etc., complete as directed by the engineer in charge.;clearing of jungle, bushes, cutting trees upto 15 cm girth by manual means or mechanical means including disposing off the material etc.,complete with all lead and lifts. thin jungle ( including parthenium growth) in difficult location hill , including cost of all material, labour, transportaion of labour and t&p etc.complete as directed by the engineer in charge.;cleaning upstream and downstream faces of the dam including removing grass / bush growth, nest, set mortar lumps by brushing,disposing off the waste materials etc.,
Sector: Generation