Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.. by mechanical means using motor grader in area of light jungle pwd csr 2023-24 vol-3 i.no 2.5.ii.b pgno 9;construction of unlined surface drains of average cross sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per technical specification clause 307. by mechanical means . pwd csr 2023-24 vol-3 i.no 16.8.b. pgno 144;earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per d
Sector: RDPR