Details: dewatering on bhp basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 5.0 to 9.0 bhp pump etc. complete. (prior approval of superintending engineer will be necessary)with in all lifts and lead as directed by engineer-incharge-of work;earth work excavation for foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workthe work in all kinds of soils depth upto 3 m with in all lifts and lead as directed
Sector: Urban Authority