Details: loosening, leveling and compacting original ground supportingembankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at omc and thencompacted by rolling so as to achieve minimum dry density asgiven in table 300-2 for embankment construction;construction of embankment by excavating the available approved gravel/murrum deposited at a place or borrow pits during or prior excavation with alllifts and lead, transportation to site, spreading, grading to required andcompacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces requiredto complete the work.;providing, laying, spreading and compacting stone aggregates ofspecific sizes to water bound macadam specification includingspreading in uniform thickness, hand packing, rolling withvibratory roller in stages to proper grade and camber, applyingand brooming requisite type of screening/ binding mat
Sector: RDPR