Details: earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as 1 directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required, utilising the available excavatedearthlocally for the work etc., and all other appurtenances complete in the following strata. all kinds of soils. depth upto 1.50 m with all lead & lift charges. (uni sor 2023-24. vol-01 chapter no.1 item no.1.17.1 page no. 10).;providing and installing at site of work p.v.c. pipes including cost of pipes and specials and labour. including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges
Sector: RDPR