Description: Advance Work for Roadside during 2024 25 Raising of plantation during 2025 26 at Siddapur to Rajnal 3 00 km Bidar Taluka
Details: Aligning in the planting area and marking for pit (without staking) (Aligning of pit in Stagerred design);Excavation of pits by mechanical of size by 0.75m x 0.75m x 0.75m and 1m x 1m x 1m with vertically cut edges to make an uniform cube and heaping the excavated soil (1/3rd top soil on the upper side & 2/3rd on the lower side) (i) Ordinary soil;Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% of the pit with the excavated soil, duly breaking the clods & formation of saucer shaped mound on the lower side of the pit;Loading of polythene / HDPE bagged seedlings into vehicle at the nursery site and unloading at the site nearest to the planting site -Seedlings raised in 14" x 20" size bags;Transportation: Transportation of polythene / HDPE bagged seedlings in vehicle from nursery site to planting site.(iv) Seedlings raised in 14"x20" size bags: Distance from 21 to 30 Kms.;Watering by dipping: Watering polythene / HDPE bagged seedlings at planting site by d
Sector: Forest and Environment