Details: cutting and burning or disposing off apu/jondu from marshy areas as directed with all other ancillary operations complete as per direction of engineer incharge of the work.;clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(in area of thorny jungle) complete as per direction of engineer incharge of the work.;earth work excavation for pipelines/cables by manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for
Sector: Irrigation