Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (vol.3, page no. 7, i.no.2.5 (ii) a) ---- including all lead lifts loading unloading transportation labour hire charges of machinery curing for concrete works cost and convene of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of engineer in charge of this work;excavation and removal of silt and silt mixed with sand in slushy . condition from canal bed including disposing off the same in spoil bank or on the canal embankment in layers as directed etc., complete with all lead and all lifts. (vol.4, page no. 104,i.no,8.24)
Sector: PWD