Description: Construction of R C C One way surge tank Supply and fixing of air valves and zero velocity valves and allied works at different chainages for rising main pipelines laid from Head works at Yargol dam to 13 MLD capacity WTP at Bangarpete 13 MLD capacity WTP at Bangarpete to 30 42 MLD capacity WTP at Kolar for surge protection under combined water Supply Scheme to Kolara city Bangarpete Maluru Towns and 45 En route Villages with Yargola Dam as a Source under UIDSSMT
Details: Clearing and grubbing land including uprooting rank vegetable grass, bushes, shrubs, saplings and trees upto 300mm girth by manual means, in areas of light jungle, removal of stumps, disposal of unserviceable materials, stacking of serviceable materials from road boundary etc. including cost of labour charges, all lead and lifts, etc. complete as directed by the Engineer in charge.;Earthwork excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. As directed by Engineer incharge and with all lead and lift.In all kinds of soils Depth upto 3 m;Earthwork excavation for Foundation by mechanical means for all works
Sector: Water supply and Sewerage