Details: carrying out excavation in hard rock to achieve a specified of the rock face by controlled use of explosives and blasting accessories in properly aligned and spaced drill holes, collection of the excavated rock by a 80 hp dozer, loading in tipper by a front end loader and disposing of the material with all lifts and lead, all as specified in clause no. 303 scarifying existing granular surface to a depth of 50 mm by mechanical means using hydraulic excavator;construction of embankment by excavating the available approved gravel/murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.;wet mix macadam (plant mix method) providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specifi
Sector: RDPR