Details: scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by mechanical means using hydraulic excavator with in all lifts and lead. ref to mort&h : irc - 305.4.3;preparation and surface treatment of formation. - preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 t smooth wheeled roller, complete as per clause 310. ref to mort&h : irc - 310;construction of subgrade and earthen shoulders - construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2. ref to mort&h : irc - 305;wet mix macadam (plant mix method) - providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification includi
Sector: PWD