Details: dismantling of good 150mva, 220/66/11kv power transformer & parts like radiator, bushings, draining of oil from transformer, releasing of transformer, ncts protection wirings complete as per the directions of site engineer incharge of work at aerospace park (186.8mt at as per transformer name plate);releasing of wiring of good 150 mva, 220/66kv power transformer,mb,oltc, rtcc and nifps at aerospace park;moving of 150mva transformer with all accessories from the plinth to the loading point at aerospace park and from unloading point to plinth at antharasnahalli s/s.(50mtr x 183.3mt=9165);loading and unloading of 150mva power transformer alongwith other accessories at aerospace park and unloading the same at antharasnahalli s/s (183.3x2=366.6);transportation of 150mva transformer main tank from 220kv r/s kiadb aerospace park to 220 kv r/s antrasanahalli using 81 mt to 120 mt truck & trailor. note: minimmum 250 kms to be considered.250kms x 1639.82=rs 409955.00 per trip;transportation of 1
Sector: Transmission