Details: carryout dgps survey, for demarcation of mwl, marking out points at every 100m interval along the proposed allignment, including painting the point, submission of survey report and drawings, which shall be in quadruplicate colour copies representing dam structures, kali river course, nearby structures along river banks, roads and bridges representing latitude and longitude of each point. the points marked shall be plotted in drawing along with location and soft copies shall be provided in .kml format complete with all lead and lifts etc, as directed by engineer incharge;boundary pillar / guard stone reinforced cement concrete m15 grade boundary pillars of standard design as per irc:25, fixed in position including finishing and lettering but excluding painting.;painting with synthetic enamel paint of approved brand and manufacture to give an even shade :two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including prepari
Sector: Generation