Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. 2.5 (ii) by mechanical means using dozer a)in area of light jungle (pwd common sr 2023-24 vol-3, pg.no.9, it.no.2.5a);scarifying existing granular surface to a depth of 50 mm by mechanical means using hydraulic excavator (csr 2023-24, vol-3, p.no-17, i.no-3.4);preparation and surface treatment of formation. preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 t smooth wheeled roller, complete as per clause 310. (pwd common sr 2023-24 vol-3, pg.no.18, it.no.3.11);granular sub-
Sector: PWD