Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) by mechanical means using dozer (a) in area of light jungle. complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work.;de-silting tank bed/feeder channel/canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle (excluding cost of transportation) including cost of all machinery, labour etc., complete with all lead and lifts, loading and unloading as per specification, drawing and direction of engineer in charge of work.;providing casing embankment using semi-pervious/pervious soil from dump areas in layers of 2
Sector: Irrigation