Details: maintenance of earth shoulder (stripping excess soil) stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor;construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2;patching of deep potholes 75mm thick by restoring the granular base course using material confirming to wbm grade-ii with type b screenings standars wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying prime coat (ss1) at 0.70kg per m2 over the wbm surface and covering the surface with sdbc 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.;kilometre stone reinforced cement concrete m15 grade kilometre stone of standard design as per irc:8-1980, fixing in position incl
Sector: PWD