Details: part adesign, construction, operation & maintenance of water supply system to babaleshwar town under amrut 2.0 (tranche-3)dpr preparation & general requirement;detailed scheme report and drawings: cost of production of set of documents & drawingstotal station survey, soil investigations including trial pits and sbc of soilconstruction documents and drawings: cost of production of set of construction documents & drawings2.1 civil, pipeline and building works2.2 mechanical plants2.3 electrical plants2.4 instrumentation and monitoring system2.5 production of progress reportsapproval of qapany additional items required for the production of construction documents & drawingsoperation and maintenance manuals: costs for the production of operation and maintenance manuals3.1 first issue (prior to tests on completion)3.2 as built o & m manuals(shall be read in conjunction with section 7: technical specifications, special specifications for all the items)providing, laying, jointing, testing and
Sector: Water supply and Sewerage