Description: Conducting 7 days Vehicle Traffic Census Survey 17 02 2025 to 24 02 2025 3 count posts on State highway and 9 count posts on Major District Road for the year of 2024 25 in Devanahalli subdivision Bangalore Rural District
Details: Providing and Erecting of Ultra HD CC Cameras with day and night vision of good resolution with data storage system along with UPS at Traffic census count post in two directions and suitably with all necessary arrangements round the clock with continuous operation for (7days during Feb/ March of 2025)from 6 AM to 6AM without any interruptions. The assignment includes mobilization, collection of data including videography from specified count location, data analysis from analysts and preparation of reports in prescribed (hard & soft copy and uploading in ) formats in required classification and submission to the concerned Sub-Divisions/ Divisions including arrangement of manpower with printing of traffic details in multi colour., etc and all other incidental Charges and as per the instruction of Engineer in charge of count post. Conducting traffic census using Automated Traffic counter and classifier with all the arrangements the clock for 7 days continuous without any interruptions, t
Sector: PWD