Description: Development of parks construction of Storm Water Drain at plot No 13 14 providing rain water harvesting near STP area beside 7th cross road dead end construction of pre cast compound wall in balance reaches at Tumakur Machine Tool Park TMTP Vasanthanarasapura Industrial Area 3rd phase Tumakuru Taluk District Balance work
Details: SWD & Development of Park: Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m with all lead and lifts complete as per specification & direction of Engineer in charge of the work.;Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all mate
Sector: Industry Development