Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. by mechanical means using dozer - in area of light jungle;compacting original ground - compacting original ground supporting embankment - loosening, leveling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction. ref to mort&h : irc - 305.3.4;mechanical means -earth work excavation for foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting o
Sector: Irrigation