Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness in area of light jungle by mechanical means using dozer (csr 2023-24 vol-3 i.no. 2.5iia);excavation and removal of silt and silt mixed with sand from canal bed in dry condition by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete (wrd csr 2023-24 vol-4 part-1 i.no. 8.24.1);geophysical investigation at site for sinking borewells for providing drinking water to the habitation either through the hand pump mws or p.w.s.s, by vertical electrical sounding by adopting venner or schlumbergers's method, including reconnaissance survey of geol
Sector: Irrigation